TitleThe Value of BIM for Project Management in a Smart Built Asset in China
Authors
Issue Date2019
PublisherICE Publishing. The Proceedings' website is located at https://www.icevirtuallibrary.com/doi/book/10.1680/icsic.64669
Citation
International Conference on Smart Infrastructure and Construction 2019 (ICSIC): Driving data-informed decision-making, Cambridge, UK, 8-10 July 2019, p. 251-260 How to Cite?
AbstractIn China, real estate has been developed rapidly in the past 30 years. According to the market competition and demand, the owners and developers realize that the project management, which applies the information of consulting, design, implementation, and operations, should be more standardized. With the maturity of construction technology and the continuous updating of digital technology, e.g., Building Information Modeling (BIM), the trend to enter into a digital world is becoming widely accepted by the AEC sectors. The perspective of owners and developers in project management includes cost, schedule, quality, and safety. While the schedule of a project is one of the most critical factors, the high turnover demand of construction market, the design depth in many cases have not met the construction requirements during the construction of the stage of projects. In the construction stage, 4D simulation can be carried out, which is based on the construction organization and design, so that the reasonable construction progress can advise the project manager. This paper aims to explore the original scheme of 4D simulation and illustrates the other main application of BIM in Chinese construction market that how to deliver a smart built asset for users.
Persistent Identifierhttp://hdl.handle.net/10722/277923
ISBN

 

DC FieldValueLanguage
dc.contributor.authorFang, F-
dc.contributor.authorTang, CML-
dc.contributor.authorRen, B-
dc.date.accessioned2019-10-04T08:04:00Z-
dc.date.available2019-10-04T08:04:00Z-
dc.date.issued2019-
dc.identifier.citationInternational Conference on Smart Infrastructure and Construction 2019 (ICSIC): Driving data-informed decision-making, Cambridge, UK, 8-10 July 2019, p. 251-260-
dc.identifier.isbn978-0-7277-6466-9-
dc.identifier.urihttp://hdl.handle.net/10722/277923-
dc.description.abstractIn China, real estate has been developed rapidly in the past 30 years. According to the market competition and demand, the owners and developers realize that the project management, which applies the information of consulting, design, implementation, and operations, should be more standardized. With the maturity of construction technology and the continuous updating of digital technology, e.g., Building Information Modeling (BIM), the trend to enter into a digital world is becoming widely accepted by the AEC sectors. The perspective of owners and developers in project management includes cost, schedule, quality, and safety. While the schedule of a project is one of the most critical factors, the high turnover demand of construction market, the design depth in many cases have not met the construction requirements during the construction of the stage of projects. In the construction stage, 4D simulation can be carried out, which is based on the construction organization and design, so that the reasonable construction progress can advise the project manager. This paper aims to explore the original scheme of 4D simulation and illustrates the other main application of BIM in Chinese construction market that how to deliver a smart built asset for users.-
dc.languageeng-
dc.publisherICE Publishing. The Proceedings' website is located at https://www.icevirtuallibrary.com/doi/book/10.1680/icsic.64669-
dc.relation.ispartofInternational Conference on Smart Infrastructure and Construction 2019 (ICSIC)-
dc.rightsThis work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.-
dc.titleThe Value of BIM for Project Management in a Smart Built Asset in China-
dc.typeConference_Paper-
dc.identifier.emailTang, CML: lcmtang@hku.hk-
dc.identifier.authorityTang, CML=rp02480-
dc.description.naturepublished_or_final_version-
dc.identifier.doi10.1680/icsic.64669.251-
dc.identifier.scopuseid_2-s2.0-85096674586-
dc.identifier.hkuros306719-
dc.identifier.spage251-
dc.identifier.epage260-
dc.publisher.placeLondon, UK-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats