Article: Simulating construction duration for multistory buildings with controlling activities

TitleSimulating construction duration for multistory buildings with controlling activities
Authors
KeywordsCritical-path method
Simulation
Scheduling
Monte Carlo method
High-rise buildings
Issue Date2013
Citation
Journal of Construction Engineering and Management, 2013, v. 139, n. 8, p. 951-959 How to Cite?
AbstractConstruction schedules are uncertain in nature; therefore, predicting construction duration is a difficult task. Extensive research has proposed mathematical models to predict construction duration based on regression analysis, Monte Carlo method (MCM), and so on. Yet regression analysis cannot capture duration uncertainties. Studies normally use Monte Carlo methods to simulate hundreds to thousands of activities in a project schedule. This can be complicated, time-consuming, and unrealistic because the statistical properties of all the activities cannot be readily determined in practice. Typical construction sequences in condominium building construction were first identified, and then the statistical distributions of controlling activities on the sequences were surveyed. Two-stage questionnaire surveys and goodness-of-fit statistical tests were conducted to achieve the mentioned objectives. Subsequently, a model for predicting the duration of building construction was proposed and applied to a high-rise building project. The results showed that the proposed model reasonably predicted the construction duration for this apartment building. The model fills the gap in knowledge of construction time forecast by introducing the concept of controlling activities to simplify the evaluation of the schedule uncertainty in multistory building construction. This research is beneficial for practitioners to estimate an overall construction schedule of building projects, especially in preconstruction phases. © 2013 American Society of Civil Engineers.
Persistent Identifierhttp://hdl.handle.net/10722/265651
ISSN
2023 Impact Factor: 4.1
2023 SCImago Journal Rankings: 1.071
ISI Accession Number ID

 

DC FieldValueLanguage
dc.contributor.authorNguyen, Long D.-
dc.contributor.authorPhan, Duc H.-
dc.contributor.authorTang, Llewellyn C.M.-
dc.date.accessioned2018-12-03T01:21:17Z-
dc.date.available2018-12-03T01:21:17Z-
dc.date.issued2013-
dc.identifier.citationJournal of Construction Engineering and Management, 2013, v. 139, n. 8, p. 951-959-
dc.identifier.issn0733-9364-
dc.identifier.urihttp://hdl.handle.net/10722/265651-
dc.description.abstractConstruction schedules are uncertain in nature; therefore, predicting construction duration is a difficult task. Extensive research has proposed mathematical models to predict construction duration based on regression analysis, Monte Carlo method (MCM), and so on. Yet regression analysis cannot capture duration uncertainties. Studies normally use Monte Carlo methods to simulate hundreds to thousands of activities in a project schedule. This can be complicated, time-consuming, and unrealistic because the statistical properties of all the activities cannot be readily determined in practice. Typical construction sequences in condominium building construction were first identified, and then the statistical distributions of controlling activities on the sequences were surveyed. Two-stage questionnaire surveys and goodness-of-fit statistical tests were conducted to achieve the mentioned objectives. Subsequently, a model for predicting the duration of building construction was proposed and applied to a high-rise building project. The results showed that the proposed model reasonably predicted the construction duration for this apartment building. The model fills the gap in knowledge of construction time forecast by introducing the concept of controlling activities to simplify the evaluation of the schedule uncertainty in multistory building construction. This research is beneficial for practitioners to estimate an overall construction schedule of building projects, especially in preconstruction phases. © 2013 American Society of Civil Engineers.-
dc.languageeng-
dc.relation.ispartofJournal of Construction Engineering and Management-
dc.subjectCritical-path method-
dc.subjectSimulation-
dc.subjectScheduling-
dc.subjectMonte Carlo method-
dc.subjectHigh-rise buildings-
dc.titleSimulating construction duration for multistory buildings with controlling activities-
dc.typeArticle-
dc.description.naturelink_to_subscribed_fulltext-
dc.identifier.doi10.1061/(ASCE)CO.1943-7862.0000677-
dc.identifier.scopuseid_2-s2.0-84880283349-
dc.identifier.volume139-
dc.identifier.issue8-
dc.identifier.spage951-
dc.identifier.epage959-
dc.identifier.isiWOS:000321558500006-
dc.identifier.issnl0733-9364-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats