File Download
There are no files associated with this item.
Links for fulltext
(May Require Subscription)
- Publisher Website: 10.1016/j.agwat.2012.10.016
- Scopus: eid_2-s2.0-84870265740
- WOS: WOS:000313309000012
Supplementary
- Citations:
- Appears in Collections:
Article: Estimating irrigation water demand using an improved method and optimizing reservoir operation for water supply and hydropower generation: A case study of the Xinfengjiang reservoir in southern China
Title | Estimating irrigation water demand using an improved method and optimizing reservoir operation for water supply and hydropower generation: A case study of the Xinfengjiang reservoir in southern China |
---|---|
Authors | |
Keywords | Hydropower generation Irrigation water demand Multi-objective optimization model Multi-purpose reservoir operation Water supply |
Issue Date | 2013 |
Publisher | Elsevier. The Journal's web site is located at http://www.elsevier.com/locate/agwat |
Citation | Agricultural Water Management, 2013, v. 116, p. 110-121 How to Cite? |
Persistent Identifier | http://hdl.handle.net/10722/188950 |
ISI Accession Number ID |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Wu, Y | en_US |
dc.contributor.author | Chen, J | en_US |
dc.date.accessioned | 2013-09-17T14:21:02Z | - |
dc.date.available | 2013-09-17T14:21:02Z | - |
dc.date.issued | 2013 | en_US |
dc.identifier.citation | Agricultural Water Management, 2013, v. 116, p. 110-121 | en_US |
dc.identifier.uri | http://hdl.handle.net/10722/188950 | - |
dc.language | eng | en_US |
dc.publisher | Elsevier. The Journal's web site is located at http://www.elsevier.com/locate/agwat | en_US |
dc.relation.ispartof | Agricultural Water Management | en_US |
dc.rights | NOTICE: this is the author’s version of a work that was accepted for publication in <Journal title>. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in PUBLICATION, [VOL#, ISSUE#, (DATE)] DOI# | en_US |
dc.subject | Hydropower generation | - |
dc.subject | Irrigation water demand | - |
dc.subject | Multi-objective optimization model | - |
dc.subject | Multi-purpose reservoir operation | - |
dc.subject | Water supply | - |
dc.title | Estimating irrigation water demand using an improved method and optimizing reservoir operation for water supply and hydropower generation: A case study of the Xinfengjiang reservoir in southern China | en_US |
dc.type | Article | en_US |
dc.identifier.email | Wu, Y: yipingwu@hkusua.hku.hk | en_US |
dc.identifier.email | Chen, J: jichen@hku.hk | en_US |
dc.identifier.authority | Chen, J=rp00098 | en_US |
dc.identifier.doi | 10.1016/j.agwat.2012.10.016 | - |
dc.identifier.scopus | eid_2-s2.0-84870265740 | - |
dc.identifier.hkuros | 223463 | en_US |
dc.identifier.volume | 116 | en_US |
dc.identifier.spage | 110 | en_US |
dc.identifier.epage | 121 | en_US |
dc.identifier.isi | WOS:000313309000012 | - |