File Download
There are no files associated with this item.
Supplementary
-
Citations:
- Scopus: 0
- Appears in Collections:
Article: Pareto optimization and its realization in VMI system considering pricing, production capacity and raw material procurement
Title | Pareto optimization and its realization in VMI system considering pricing, production capacity and raw material procurement |
---|---|
Authors | |
Keywords | Bargaining Vmi Logistic System Management Lot-Sizing Pareto Optimality |
Issue Date | 2005 |
Citation | Xitong Gongcheng Lilun Yu Shijian/System Engineering Theory And Practice, 2005, v. 25 n. 4, p. 1-7 How to Cite? |
Abstract | This paper firstly talk about the general condition for Pareto optimality in the VMI system where non-cooperation game occurs considering pricing, production capacity and raw material procurement. Secondly the feasible set for Pareto optimality based on the Stackelberg equilibrium is developed. Thirdly we proposed a Nash bargaining model that can realize the Pareto optimality for the manufacturer and all retailers. Lastly a numerical example is given to illustrate the theory that the cooperation makes the enterprises' net profit increased significantly. |
Persistent Identifier | http://hdl.handle.net/10722/155875 |
ISSN | 2023 SCImago Journal Rankings: 0.312 |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Yu, YG | en_US |
dc.contributor.author | Liang, L | en_US |
dc.contributor.author | Yu, Y | en_US |
dc.contributor.author | Huang, GQ | en_US |
dc.date.accessioned | 2012-08-08T08:38:08Z | - |
dc.date.available | 2012-08-08T08:38:08Z | - |
dc.date.issued | 2005 | en_US |
dc.identifier.citation | Xitong Gongcheng Lilun Yu Shijian/System Engineering Theory And Practice, 2005, v. 25 n. 4, p. 1-7 | en_US |
dc.identifier.issn | 1000-6788 | en_US |
dc.identifier.uri | http://hdl.handle.net/10722/155875 | - |
dc.description.abstract | This paper firstly talk about the general condition for Pareto optimality in the VMI system where non-cooperation game occurs considering pricing, production capacity and raw material procurement. Secondly the feasible set for Pareto optimality based on the Stackelberg equilibrium is developed. Thirdly we proposed a Nash bargaining model that can realize the Pareto optimality for the manufacturer and all retailers. Lastly a numerical example is given to illustrate the theory that the cooperation makes the enterprises' net profit increased significantly. | en_US |
dc.language | eng | en_US |
dc.relation.ispartof | Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice | en_US |
dc.subject | Bargaining | en_US |
dc.subject | Vmi | en_US |
dc.subject | Logistic System Management | en_US |
dc.subject | Lot-Sizing | en_US |
dc.subject | Pareto Optimality | en_US |
dc.title | Pareto optimization and its realization in VMI system considering pricing, production capacity and raw material procurement | en_US |
dc.type | Article | en_US |
dc.identifier.email | Huang, GQ:gqhuang@hkucc.hku.hk | en_US |
dc.identifier.authority | Huang, GQ=rp00118 | en_US |
dc.description.nature | link_to_subscribed_fulltext | en_US |
dc.identifier.scopus | eid_2-s2.0-18744371054 | en_US |
dc.identifier.volume | 25 | en_US |
dc.identifier.issue | 4 | en_US |
dc.identifier.spage | 1 | en_US |
dc.identifier.epage | 7 | en_US |
dc.identifier.scopusauthorid | Yu, YG=14822788000 | en_US |
dc.identifier.scopusauthorid | Liang, L=25632675700 | en_US |
dc.identifier.scopusauthorid | Yu, Y=24759748100 | en_US |
dc.identifier.scopusauthorid | Huang, GQ=7403425048 | en_US |
dc.identifier.issnl | 1000-6788 | - |