File Download
Supplementary
-
Citations:
- Appears in Collections:
Conference Paper: Integrated process planning and scheduling with setup time consideration by ant colony optimization
Title | Integrated process planning and scheduling with setup time consideration by ant colony optimization |
---|---|
Authors | |
Keywords | Integrated process planning and scheduling Setup time Ant Colony Optimization |
Issue Date | 2011 |
Publisher | CIE41. |
Citation | The 41st International Conference on Computer and Industrial Engineering (CIE41), Los Angeles, CA.,23-25 October 2011. In Proceedings of CIE41, 2011, p. 998-1003, no. 327 How to Cite? |
Abstract | This paper presents an ant colony optimization (ACO) approach in solving integrated process planning and scheduling (IPPS) with the consideration of setup time. Lots of approaches are proposed to solve the IPPS problem. Most of these approaches ignored the consideration of setup time in order to simplify the problem. This practice may be justifiable for some situations. However, it is not practical for the job involving a lot of sequent-dependent setup time. This paper will also discuss the importance of the consideration of setup time in handling IPPS problem. |
Persistent Identifier | http://hdl.handle.net/10722/143928 |
ISSN | 2020 SCImago Journal Rankings: 0.123 |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Wan, SY | en_US |
dc.contributor.author | Wong, TN | en_US |
dc.contributor.author | Zhang, S | en_US |
dc.contributor.author | Zhang, L | en_US |
dc.date.accessioned | 2011-12-21T08:58:44Z | - |
dc.date.available | 2011-12-21T08:58:44Z | - |
dc.date.issued | 2011 | en_US |
dc.identifier.citation | The 41st International Conference on Computer and Industrial Engineering (CIE41), Los Angeles, CA.,23-25 October 2011. In Proceedings of CIE41, 2011, p. 998-1003, no. 327 | en_US |
dc.identifier.issn | 2164-8689 | - |
dc.identifier.uri | http://hdl.handle.net/10722/143928 | - |
dc.description.abstract | This paper presents an ant colony optimization (ACO) approach in solving integrated process planning and scheduling (IPPS) with the consideration of setup time. Lots of approaches are proposed to solve the IPPS problem. Most of these approaches ignored the consideration of setup time in order to simplify the problem. This practice may be justifiable for some situations. However, it is not practical for the job involving a lot of sequent-dependent setup time. This paper will also discuss the importance of the consideration of setup time in handling IPPS problem. | - |
dc.language | eng | en_US |
dc.publisher | CIE41. | - |
dc.relation.ispartof | Proceedings of the 41st International Conference on Computer and Industrial Engineering, CIE41 | en_US |
dc.subject | Integrated process planning and scheduling | - |
dc.subject | Setup time | - |
dc.subject | Ant Colony Optimization | - |
dc.title | Integrated process planning and scheduling with setup time consideration by ant colony optimization | en_US |
dc.type | Conference_Paper | en_US |
dc.identifier.email | Wan, SY: wanszeyuen@msn.com | en_US |
dc.identifier.email | Wong, TN: tnwong@hku.hk | - |
dc.identifier.email | Zhang, S: h1095072@hku.hk | - |
dc.identifier.email | Zhang, L: nguzlp@hku.hk | - |
dc.identifier.authority | Wong, TN=rp00192 | en_US |
dc.description.nature | link_to_OA_fulltext | - |
dc.identifier.hkuros | 197931 | en_US |
dc.identifier.spage | 998 | en_US |
dc.identifier.epage | 1003 | en_US |
dc.publisher.place | United States | - |
dc.description.other | The 41st International Conference on Computer and Industrial Engineering (CIE41), Los Angeles, CA.,23-25 October 2011. In Proceedings of CIE41, 2011, p. 998-1003, no. 327 | - |
dc.identifier.issnl | 2164-8670 | - |