Showing results 1 to 3 of 3
Title | Author(s) | Issue Date | |
---|---|---|---|
Delineating the performance standards of engineering consultants at design stage Journal:Construction Management and Economics | 2010 | ||
A fuzzy gap analysis model for evaluating the performance of engineering consultants Journal:Automation in Construction | 2007 | ||
Variational fuzzy mumford-shah model for image segmentation Journal:SIAM Journal on Applied Mathematics | 2010 |