File Download
Supplementary
-
Citations:
- Appears in Collections:
Conference Paper: A new hybrid genetic algorithm and Tabu Search Method for yard cranes scheduling with inter-crane interference
Title | A new hybrid genetic algorithm and Tabu Search Method for yard cranes scheduling with inter-crane interference |
---|---|
Authors | |
Keywords | Yard Crane inter-crane Interference Hybrid algorithm Genetic Algorithm Tabu Search |
Issue Date | 2009 |
Publisher | Newswood Limited. |
Citation | World Congress on Engineering 2009, London, UK, 1-3 July 2009, v. 1, p. 526-531 How to Cite? |
Abstract | Effective and efficient scheduling of yard crane
operations is essential to guarantee a smooth and fast container
flow in a container terminal, thus leading to a high terminal
throughput. This paper studies the problem of scheduling yard
cranes to perform a given set of loading and unloading jobs with
different ready times in a yard zone. In particular, the
inter-crane interference between adjacent yard cranes which
results in the movement of a yard crane being blocked by
adjacent yard cranes is studied. The objective is to minimize the
sum of yard crane completing times. Since the scheduling
problem is NP-complete, a new hybrid optimization algorithm
combining the techniques of genetic algorithm and tabu search
method (GA-TS) is proposed to solve the challenging problem.
Two new operators, namely the Tabu Search Crossover (TSC)
and the Tabu Search Mutation (TSM), are introduced into the
proposed algorithm to ensure efficient computation. A set of test
problems generated randomly based on real life data is used to
evaluate the performance of the proposed algorithm.
Computational results clearly indicate that GA-TS can
successfully locate cost-effective solutions which are on average
20% better than that located by GA. Indeed, the proposed
hybrid algorithm is an effective and efficient means for
scheduling yard cranes in computer terminals. |
Persistent Identifier | http://hdl.handle.net/10722/100261 |
ISBN |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Mak, KL | - |
dc.contributor.author | Sun, D | - |
dc.date.accessioned | 2010-09-25T19:03:00Z | - |
dc.date.available | 2010-09-25T19:03:00Z | - |
dc.date.issued | 2009 | - |
dc.identifier.citation | World Congress on Engineering 2009, London, UK, 1-3 July 2009, v. 1, p. 526-531 | - |
dc.identifier.isbn | 978-988-17012-5-1 | - |
dc.identifier.uri | http://hdl.handle.net/10722/100261 | - |
dc.description.abstract | Effective and efficient scheduling of yard crane operations is essential to guarantee a smooth and fast container flow in a container terminal, thus leading to a high terminal throughput. This paper studies the problem of scheduling yard cranes to perform a given set of loading and unloading jobs with different ready times in a yard zone. In particular, the inter-crane interference between adjacent yard cranes which results in the movement of a yard crane being blocked by adjacent yard cranes is studied. The objective is to minimize the sum of yard crane completing times. Since the scheduling problem is NP-complete, a new hybrid optimization algorithm combining the techniques of genetic algorithm and tabu search method (GA-TS) is proposed to solve the challenging problem. Two new operators, namely the Tabu Search Crossover (TSC) and the Tabu Search Mutation (TSM), are introduced into the proposed algorithm to ensure efficient computation. A set of test problems generated randomly based on real life data is used to evaluate the performance of the proposed algorithm. Computational results clearly indicate that GA-TS can successfully locate cost-effective solutions which are on average 20% better than that located by GA. Indeed, the proposed hybrid algorithm is an effective and efficient means for scheduling yard cranes in computer terminals. | - |
dc.language | eng | - |
dc.publisher | Newswood Limited. | - |
dc.relation.ispartof | Proceedings of the World Congress on Engineering 2009 | - |
dc.subject | Yard Crane | - |
dc.subject | inter-crane Interference | - |
dc.subject | Hybrid algorithm | - |
dc.subject | Genetic Algorithm | - |
dc.subject | Tabu Search | - |
dc.title | A new hybrid genetic algorithm and Tabu Search Method for yard cranes scheduling with inter-crane interference | - |
dc.type | Conference_Paper | - |
dc.identifier.email | Mak, KL: makkl@hkucc.hku.hk | - |
dc.identifier.authority | Mak, KL=rp00154 | - |
dc.description.nature | link_to_OA_fulltext | - |
dc.identifier.hkuros | 167111 | - |
dc.identifier.volume | 1 | - |
dc.identifier.spage | 526 | - |
dc.identifier.epage | 531 | - |
dc.publisher.place | London, UK | - |