File Download
There are no files associated with this item.
Links for fulltext
(May Require Subscription)
- Publisher Website: 10.1080/01446190902838217
- Scopus: eid_2-s2.0-67650337837
- WOS: WOS:000213267200004
- Find via
Supplementary
- Citations:
- Appears in Collections:
Article: Rethinking project management and exploring virtual design and construction as a potential solution
Title | Rethinking project management and exploring virtual design and construction as a potential solution |
---|---|
Authors | |
Keywords | Project management Virtual design and construction |
Issue Date | 2009 |
Publisher | Routledge. The Journal's web site is located at http://www.tandf.co.uk/journals/titles/01446193.asp |
Citation | Construction Management And Economics, 2009, v. 27 n. 4, p. 363-371 How to Cite? |
Abstract | The construction sector is facing widespread criticism of its low efficiency and poor performance. This has led to a rethink of contemporary project management (PM). However, current critical perspectives have failed to diagnose the practical problems existing in PM, and as a consequence, no promising solutions have been proposed. In this research, a combination of critical literature review, field works, case studies, open debates and interviews revealed five fundamentally problematic aspects of contemporary PM: (1) using artificial tools and methods; (2) cannot try before build; (3) discontinuity in construction processes; (4) ineffective information and knowledge management; and (5) creeping managerialism. These problems were then scrutinized by referring them to Virtual Design and Construction (VDC) as a potential solution. Strengths of VDC are explored, and hurdles that prevent it from gaining momentum are also evaluated. It is found that the problems of contemporary PM can largely be alleviated by the use of VDC although its many hurdles are yet to be overcome. This research provides new insights into how construction companies can adopt VDC technology to improve the problematic PM practices. |
Persistent Identifier | http://hdl.handle.net/10722/91962 |
ISSN | 2023 Impact Factor: 3.0 2023 SCImago Journal Rankings: 0.874 |
ISI Accession Number ID | |
References |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Li, H | en_HK |
dc.contributor.author | Lu, W | en_HK |
dc.contributor.author | Huang, T | en_HK |
dc.date.accessioned | 2010-09-17T10:31:53Z | - |
dc.date.available | 2010-09-17T10:31:53Z | - |
dc.date.issued | 2009 | en_HK |
dc.identifier.citation | Construction Management And Economics, 2009, v. 27 n. 4, p. 363-371 | en_HK |
dc.identifier.issn | 0144-6193 | en_HK |
dc.identifier.uri | http://hdl.handle.net/10722/91962 | - |
dc.description.abstract | The construction sector is facing widespread criticism of its low efficiency and poor performance. This has led to a rethink of contemporary project management (PM). However, current critical perspectives have failed to diagnose the practical problems existing in PM, and as a consequence, no promising solutions have been proposed. In this research, a combination of critical literature review, field works, case studies, open debates and interviews revealed five fundamentally problematic aspects of contemporary PM: (1) using artificial tools and methods; (2) cannot try before build; (3) discontinuity in construction processes; (4) ineffective information and knowledge management; and (5) creeping managerialism. These problems were then scrutinized by referring them to Virtual Design and Construction (VDC) as a potential solution. Strengths of VDC are explored, and hurdles that prevent it from gaining momentum are also evaluated. It is found that the problems of contemporary PM can largely be alleviated by the use of VDC although its many hurdles are yet to be overcome. This research provides new insights into how construction companies can adopt VDC technology to improve the problematic PM practices. | en_HK |
dc.language | eng | en_HK |
dc.publisher | Routledge. The Journal's web site is located at http://www.tandf.co.uk/journals/titles/01446193.asp | en_HK |
dc.relation.ispartof | Construction Management and Economics | en_HK |
dc.subject | Project management | en_HK |
dc.subject | Virtual design and construction | en_HK |
dc.title | Rethinking project management and exploring virtual design and construction as a potential solution | en_HK |
dc.type | Article | en_HK |
dc.identifier.openurl | http://library.hku.hk:4550/resserv?sid=HKU:IR&issn=0144-6193&volume=27&issue=4&spage=363&epage=371&date=2009&atitle=Rethinking+project+management+and+exploring+virtual+design+and+construction+as+a+potential+solution | - |
dc.identifier.email | Lu, W:wilsonlu@hku.hk | en_HK |
dc.identifier.authority | Lu, W=rp01362 | en_HK |
dc.description.nature | link_to_subscribed_fulltext | - |
dc.identifier.doi | 10.1080/01446190902838217 | en_HK |
dc.identifier.scopus | eid_2-s2.0-67650337837 | en_HK |
dc.identifier.hkuros | 167712 | - |
dc.relation.references | http://www.scopus.com/mlt/select.url?eid=2-s2.0-67650337837&selection=ref&src=s&origin=recordpage | en_HK |
dc.identifier.volume | 27 | en_HK |
dc.identifier.issue | 4 | en_HK |
dc.identifier.spage | 363 | en_HK |
dc.identifier.epage | 371 | en_HK |
dc.identifier.isi | WOS:000213267200004 | - |
dc.publisher.place | United Kingdom | en_HK |
dc.identifier.scopusauthorid | Li, H=8692514900 | en_HK |
dc.identifier.scopusauthorid | Lu, W=24173836000 | en_HK |
dc.identifier.scopusauthorid | Huang, T=7404961523 | en_HK |
dc.identifier.citeulike | 4960053 | - |
dc.identifier.issnl | 0144-6193 | - |