File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Article: Use of full face slurry shield for pipe jacking in Hong Kong's reclaimed land

TitleUse of full face slurry shield for pipe jacking in Hong Kong's reclaimed land
Authors
KeywordsDrainage construction
Full face slurry shield
Hong Kong
Pipe jacking
Reclaimed land
Tunneling engineering
Issue Date2003
Citation
Yanshilixue Yu Gongcheng Xuebao/Chinese Journal Of Rock Mechanics And Engineering, 2003, v. 22 SUPPL., p. 2438-2442 How to Cite?
AbstractPipe jacking has become a popular method in drainage construction in Hong Kong. However, the varied ground conditions encountered in reclaimed land may pose severe problems to pipe jacking operation. This paper presents the experience of using the full face slurry shield for pipe jacking in a reclaimed area. The study shows that the full face slurry shield with a rock cutting head performs satisfactorily. To ensure the machine can work effectively in all ground conditions, other factors need to be considered including the rock cutting head being worn away, the hitting of underground structures, the sustainability of jacked pipes alignment, the associated ground settlement and the damage to the jacked pipes caused by the jacking pressure.
Persistent Identifierhttp://hdl.handle.net/10722/81703
ISSN
2020 SCImago Journal Rankings: 0.654
References

 

DC FieldValueLanguage
dc.contributor.authorYing, HMen_HK
dc.contributor.authorPoon, SWen_HK
dc.date.accessioned2010-09-06T08:21:03Z-
dc.date.available2010-09-06T08:21:03Z-
dc.date.issued2003en_HK
dc.identifier.citationYanshilixue Yu Gongcheng Xuebao/Chinese Journal Of Rock Mechanics And Engineering, 2003, v. 22 SUPPL., p. 2438-2442en_HK
dc.identifier.issn1000-6915en_HK
dc.identifier.urihttp://hdl.handle.net/10722/81703-
dc.description.abstractPipe jacking has become a popular method in drainage construction in Hong Kong. However, the varied ground conditions encountered in reclaimed land may pose severe problems to pipe jacking operation. This paper presents the experience of using the full face slurry shield for pipe jacking in a reclaimed area. The study shows that the full face slurry shield with a rock cutting head performs satisfactorily. To ensure the machine can work effectively in all ground conditions, other factors need to be considered including the rock cutting head being worn away, the hitting of underground structures, the sustainability of jacked pipes alignment, the associated ground settlement and the damage to the jacked pipes caused by the jacking pressure.en_HK
dc.languageengen_HK
dc.relation.ispartofYanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineeringen_HK
dc.subjectDrainage constructionen_HK
dc.subjectFull face slurry shielden_HK
dc.subjectHong Kongen_HK
dc.subjectPipe jackingen_HK
dc.subjectReclaimed landen_HK
dc.subjectTunneling engineeringen_HK
dc.titleUse of full face slurry shield for pipe jacking in Hong Kong's reclaimed landen_HK
dc.typeArticleen_HK
dc.identifier.emailPoon, SW:swpoon@hkucc.hku.hken_HK
dc.identifier.authorityPoon, SW=rp01017en_HK
dc.description.naturelink_to_subscribed_fulltext-
dc.identifier.scopuseid_2-s2.0-0348143519en_HK
dc.identifier.hkuros94558en_HK
dc.relation.referenceshttp://www.scopus.com/mlt/select.url?eid=2-s2.0-0348143519&selection=ref&src=s&origin=recordpageen_HK
dc.identifier.volume22en_HK
dc.identifier.issueSUPPL.en_HK
dc.identifier.spage2438en_HK
dc.identifier.epage2442en_HK
dc.publisher.placeChinaen_HK
dc.identifier.scopusauthoridYing, HM=7101835663en_HK
dc.identifier.scopusauthoridPoon, SW=7102884280en_HK
dc.identifier.issnl1000-6915-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats