File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Article: Investigation of an additional part to optimal schedule

TitleInvestigation of an additional part to optimal schedule
Authors
Issue Date1998
PublisherEmerald Group Publishing Limited. The Journal's web site is located at http://www.emeraldinsight.com/info/journals/jmtm/jmtm.jsp
Citation
Integrated Manufacturing Systems, 1998, v. 9 n. 3, p. 193-196 How to Cite?
AbstractThe pair-wise comparison technique has been applied to many algorithms for solving complicated scheduling problems. The optimality gap between the pair-wise comparison technique and mathematical programming model is mainly due to deterioration in performance when optimal pairs of different sub-schedules are linked together to form a complete schedule. This paper investigates the effect of adding a part prior to the part-pair in a 2-part-2-machine optimal sub-schedule. The conditions in which interchange of part-pair sequence is required in order to minimise or maintain the makespan when a part is added are analysed mathematically, and the results are reported.
Persistent Identifierhttp://hdl.handle.net/10722/74532
ISSN
References

 

DC FieldValueLanguage
dc.contributor.authorChoi, SHen_HK
dc.contributor.authorLee, JSLen_HK
dc.date.accessioned2010-09-06T07:02:15Z-
dc.date.available2010-09-06T07:02:15Z-
dc.date.issued1998en_HK
dc.identifier.citationIntegrated Manufacturing Systems, 1998, v. 9 n. 3, p. 193-196en_HK
dc.identifier.issn0957-6061en_HK
dc.identifier.urihttp://hdl.handle.net/10722/74532-
dc.description.abstractThe pair-wise comparison technique has been applied to many algorithms for solving complicated scheduling problems. The optimality gap between the pair-wise comparison technique and mathematical programming model is mainly due to deterioration in performance when optimal pairs of different sub-schedules are linked together to form a complete schedule. This paper investigates the effect of adding a part prior to the part-pair in a 2-part-2-machine optimal sub-schedule. The conditions in which interchange of part-pair sequence is required in order to minimise or maintain the makespan when a part is added are analysed mathematically, and the results are reported.en_HK
dc.languageengen_HK
dc.publisherEmerald Group Publishing Limited. The Journal's web site is located at http://www.emeraldinsight.com/info/journals/jmtm/jmtm.jspen_HK
dc.relation.ispartofIntegrated Manufacturing Systemsen_HK
dc.titleInvestigation of an additional part to optimal scheduleen_HK
dc.typeArticleen_HK
dc.identifier.emailChoi, SH:shchoi@hkucc.hku.hken_HK
dc.identifier.authorityChoi, SH=rp00109en_HK
dc.description.naturelink_to_subscribed_fulltext-
dc.identifier.scopuseid_2-s2.0-0031624620en_HK
dc.identifier.hkuros37673en_HK
dc.relation.referenceshttp://www.scopus.com/mlt/select.url?eid=2-s2.0-0031624620&selection=ref&src=s&origin=recordpageen_HK
dc.identifier.volume9en_HK
dc.identifier.issue3en_HK
dc.identifier.spage193en_HK
dc.identifier.epage196en_HK
dc.publisher.placeUnited Kingdomen_HK
dc.identifier.scopusauthoridChoi, SH=7408119615en_HK
dc.identifier.scopusauthoridLee, JSL=8438644700en_HK
dc.identifier.issnl0957-6061-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats