Article: A study of the factors affecting construction durations in Hong Kong

TitleA study of the factors affecting construction durations in Hong Kong
Authors
KeywordsConstruction duration
Time-related models
Productivity case study
Hong Kong
Issue Date1995
PublisherRoutledge. The Journal's web site is located at http://www.tandf.co.uk/journals/titles/01446193.asp
Citation
Construction Management and Economics, 1995, v. 13 n. 4, p. 319-333 How to Cite?
AbstractThis is the second phase of an investigation into the significant factors influencing construction duration of projects in Hong Kong. The results of the first phase led to the conclusion that larger samples were justified to investigate further the discerned relationships. Expanded samples were obtained in this second phase by adding some reported data from Hong Kong projects to the original surveyed sample. The second phase of this study also further investigates the relationships between different project characteristic variables such as the construction duration, construction cost, total gross floor area and the number of storeys in the case of buildings. Moreover, a case study on plant utilization level and site labour productivity was carried out on a building site to explore the ‘micro-factors’ that affect construction durations. The findings are of importance to all construction industry participants as the derived models help to estimate the construction duration of a project on the basis of significant macro project parameters. Additionally, the results of the case study indicate the contribution of significantly variable site productivity levels to overall construction duration and suggest an agenda for future investigations. A third phase of this study is planned incorporating more detailed data collection and analysis of significant factors, as well as international comparisons where possible.
Persistent Identifierhttp://hdl.handle.net/10722/71444
ISSN
2023 Impact Factor: 3.0
2023 SCImago Journal Rankings: 0.874

 

DC FieldValueLanguage
dc.contributor.authorChan, DWM-
dc.contributor.authorKumaraswamy, MM-
dc.date.accessioned2010-09-06T06:32:03Z-
dc.date.available2010-09-06T06:32:03Z-
dc.date.issued1995-
dc.identifier.citationConstruction Management and Economics, 1995, v. 13 n. 4, p. 319-333-
dc.identifier.issn0144-6193-
dc.identifier.urihttp://hdl.handle.net/10722/71444-
dc.description.abstractThis is the second phase of an investigation into the significant factors influencing construction duration of projects in Hong Kong. The results of the first phase led to the conclusion that larger samples were justified to investigate further the discerned relationships. Expanded samples were obtained in this second phase by adding some reported data from Hong Kong projects to the original surveyed sample. The second phase of this study also further investigates the relationships between different project characteristic variables such as the construction duration, construction cost, total gross floor area and the number of storeys in the case of buildings. Moreover, a case study on plant utilization level and site labour productivity was carried out on a building site to explore the ‘micro-factors’ that affect construction durations. The findings are of importance to all construction industry participants as the derived models help to estimate the construction duration of a project on the basis of significant macro project parameters. Additionally, the results of the case study indicate the contribution of significantly variable site productivity levels to overall construction duration and suggest an agenda for future investigations. A third phase of this study is planned incorporating more detailed data collection and analysis of significant factors, as well as international comparisons where possible.-
dc.languageeng-
dc.publisherRoutledge. The Journal's web site is located at http://www.tandf.co.uk/journals/titles/01446193.asp-
dc.relation.ispartofConstruction Management and Economics-
dc.rightsPreprint: This is an Author's Original Manuscript of an article published by Taylor & Francis Group in [JOURNAL TITLE] on [date of publication], available online: http://www.tandfonline.com/doi/abs/[Article DOI]. Postprint: This is an Accepted Manuscript of an article published by Taylor & Francis Group in [JOURNAL TITLE] on [date of publication], available online at: http://www.tandfonline.com/doi/abs/[Article DOI]. -
dc.subjectConstruction duration-
dc.subjectTime-related models-
dc.subjectProductivity case study-
dc.subjectHong Kong-
dc.titleA study of the factors affecting construction durations in Hong Kong-
dc.typeArticle-
dc.identifier.openurlhttp://library.hku.hk:4550/resserv?sid=HKU:IR&issn=0144-6193&volume=13&issue=4&spage=319&epage=333&date=1995&atitle=A+study+of+the+factors+affecting+construction+durations+in+Hong+Kongen_HK
dc.identifier.emailKumaraswamy, MM: mohan@hkucc.hku.hk-
dc.identifier.authorityKumaraswamy, MM=rp00126-
dc.identifier.doi10.1080/01446199500000037-
dc.identifier.scopuseid_2-s2.0-84948516864-
dc.identifier.hkuros14165-
dc.identifier.volume13-
dc.identifier.issue4-
dc.identifier.spage319-
dc.identifier.epage333-
dc.publisher.placeUnited Kingdom-
dc.identifier.issnl0144-6193-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats