File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Article: Comparing contributors to time and cost performance in building projects

TitleComparing contributors to time and cost performance in building projects
Authors
KeywordsHong Kong
Modelling
Performance
Procurement
Regression
Issue Date1999
PublisherPergamon. The Journal's web site is located at http://www.elsevier.com/locate/buildenv
Citation
Building And Environment, 1999, v. 34 n. 1, p. 31-42 How to Cite?
AbstractIdentifying the relative strengths of the linkages between procurement sub-systems and project performance was initially hypothesized to be useful for developing guidelines for the formulation of a performance-oriented construction procurement system. A comprehensive model was developed to incorporate all significant procurement sub-systems variables, together with 'non-procurement' related (or 'intervening') variables to explore and evaluate such linkages. The multiple regression technique was applied to analyze the data from 32 Hong Kong-based building projects and the results were compared with reality. The results suggest that procurement sub-systems variables are less significant than the non-procurement related variables in predicting time and cost performance levels on Hong Kong building projects.
Persistent Identifierhttp://hdl.handle.net/10722/70855
ISSN
2023 Impact Factor: 7.1
2023 SCImago Journal Rankings: 1.647
References

 

DC FieldValueLanguage
dc.contributor.authorDissanayaka, SMen_HK
dc.contributor.authorKumaraswamy, MMen_HK
dc.date.accessioned2010-09-06T06:26:43Z-
dc.date.available2010-09-06T06:26:43Z-
dc.date.issued1999en_HK
dc.identifier.citationBuilding And Environment, 1999, v. 34 n. 1, p. 31-42en_HK
dc.identifier.issn0360-1323en_HK
dc.identifier.urihttp://hdl.handle.net/10722/70855-
dc.description.abstractIdentifying the relative strengths of the linkages between procurement sub-systems and project performance was initially hypothesized to be useful for developing guidelines for the formulation of a performance-oriented construction procurement system. A comprehensive model was developed to incorporate all significant procurement sub-systems variables, together with 'non-procurement' related (or 'intervening') variables to explore and evaluate such linkages. The multiple regression technique was applied to analyze the data from 32 Hong Kong-based building projects and the results were compared with reality. The results suggest that procurement sub-systems variables are less significant than the non-procurement related variables in predicting time and cost performance levels on Hong Kong building projects.en_HK
dc.languageengen_HK
dc.publisherPergamon. The Journal's web site is located at http://www.elsevier.com/locate/buildenven_HK
dc.relation.ispartofBuilding and Environmenten_HK
dc.subjectHong Kongen_HK
dc.subjectModellingen_HK
dc.subjectPerformanceen_HK
dc.subjectProcurementen_HK
dc.subjectRegressionen_HK
dc.titleComparing contributors to time and cost performance in building projectsen_HK
dc.typeArticleen_HK
dc.identifier.openurlhttp://library.hku.hk:4550/resserv?sid=HKU:IR&issn=0360-1323&volume=34 &issue=1&spage=31 &epage= 42&date=1999&atitle=Comparing+Contributors+to+Time+and+Cost+Performance+in+Building+Projectsen_HK
dc.identifier.emailKumaraswamy, MM:mohan@hkucc.hku.hken_HK
dc.identifier.authorityKumaraswamy, MM=rp00126en_HK
dc.description.naturelink_to_subscribed_fulltext-
dc.identifier.scopuseid_2-s2.0-0032804033en_HK
dc.identifier.hkuros43245en_HK
dc.relation.referenceshttp://www.scopus.com/mlt/select.url?eid=2-s2.0-0032804033&selection=ref&src=s&origin=recordpageen_HK
dc.identifier.volume34en_HK
dc.identifier.issue1en_HK
dc.identifier.spage31en_HK
dc.identifier.epage42en_HK
dc.publisher.placeUnited Kingdomen_HK
dc.identifier.scopusauthoridDissanayaka, SM=7801627307en_HK
dc.identifier.scopusauthoridKumaraswamy, MM=35566270600en_HK
dc.identifier.issnl0360-1323-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats