File Download
 
 
Supplementary

Postgraduate Thesis: Effective controls for engineering oriented construction project: a case study of Black Point Power StationProject
  • Basic View
  • Metadata View
  • XML View
TitleEffective controls for engineering oriented construction project: a case study of Black Point Power StationProject
 
AuthorsYiu, Hor-pui.
姚可培.
 
Issue Date1996
 
PublisherThe University of Hong Kong (Pokfulam, Hong Kong)
 
DegreeMaster of Science in Construction Project Management
 
SubjectProject management - China - Hong Kong - Case studies.
Electric power-plants - Design and construction.
 
Dept/ProgramReal Estate and Construction
 
DC FieldValue
dc.contributor.authorYiu, Hor-pui.
 
dc.contributor.author姚可培.
 
dc.date.hkucongregation1996
 
dc.date.issued1996
 
dc.description.naturepublished_or_final_version
 
dc.description.thesisdisciplineReal Estate and Construction
 
dc.description.thesislevelmaster's
 
dc.description.thesisnameMaster of Science in Construction Project Management
 
dc.identifier.hkulb3125143
 
dc.languageeng
 
dc.publisherThe University of Hong Kong (Pokfulam, Hong Kong)
 
dc.relation.ispartofHKU Theses Online (HKUTO)
 
dc.rightsThe author retains all proprietary rights, (such as patent rights) and the right to use in future works.
 
dc.rightsCreative Commons: Attribution 3.0 Hong Kong License
 
dc.source.urihttp://hub.hku.hk/bib/B31251432
 
dc.subject.lcshProject management - China - Hong Kong - Case studies.
 
dc.subject.lcshElectric power-plants - Design and construction.
 
dc.titleEffective controls for engineering oriented construction project: a case study of Black Point Power StationProject
 
dc.typePG_Thesis
 
<?xml encoding="utf-8" version="1.0"?>
<item><contributor.author>Yiu, Hor-pui.</contributor.author>
<contributor.author>&#23002;&#21487;&#22521;.</contributor.author>
<date.issued>1996</date.issued>
<language>eng</language>
<publisher>The University of Hong Kong (Pokfulam, Hong Kong)</publisher>
<relation.ispartof>HKU Theses Online (HKUTO)</relation.ispartof>
<rights>The author retains all proprietary rights, (such as patent rights) and the right to use in future works.</rights>
<rights>Creative Commons: Attribution 3.0 Hong Kong License</rights>
<source.uri>http://hub.hku.hk/bib/B31251432</source.uri>
<subject.lcsh>Project management - China - Hong Kong - Case studies.</subject.lcsh>
<subject.lcsh>Electric power-plants - Design and construction.</subject.lcsh>
<title>Effective controls for engineering oriented construction project: a case study of Black Point Power StationProject</title>
<type>PG_Thesis</type>
<identifier.hkul>b3125143</identifier.hkul>
<description.thesisname>Master of Science in Construction Project Management</description.thesisname>
<description.thesislevel>master&apos;s</description.thesislevel>
<description.thesisdiscipline>Real Estate and Construction</description.thesisdiscipline>
<description.nature>published_or_final_version</description.nature>
<date.hkucongregation>1996</date.hkucongregation>
<bitstream.url>http://hub.hku.hk/bitstream/10722/37060/1/FullText.pdf</bitstream.url>
</item>