File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Conference Paper: Value-based transmission expansion planning in deregulated market

TitleValue-based transmission expansion planning in deregulated market
Authors
KeywordsDeregulation
Monte Carlo Simulation
Transmission Expansion Planning
Value-Based
Issue Date2006
Citation
2006 38Th Annual North American Power Symposium, Naps-2006 Proceedings, 2006, p. 107-114 How to Cite?
AbstractTransmission expansion planning (TEP) has faced a significant change since the deregulation of power systems. It becomes even more complicated due to the conflicting objectives and uncertainties which have been exposed by the power industry restructuring. In this paper, a value-based transmission expansion planning algorithm is proposed. The algorithm makes use of the probability density functions (PDFs) of locational marginal prices (LMPs) to deal with the changes in power flow patterns due to the changes in offering prices set by generation companies. © 2006 IEEE.
Persistent Identifierhttp://hdl.handle.net/10722/158535
References

 

DC FieldValueLanguage
dc.contributor.authorLee, CWen_US
dc.contributor.authorNg, SKKen_US
dc.contributor.authorZhong, Jen_US
dc.date.accessioned2012-08-08T09:00:08Z-
dc.date.available2012-08-08T09:00:08Z-
dc.date.issued2006en_US
dc.identifier.citation2006 38Th Annual North American Power Symposium, Naps-2006 Proceedings, 2006, p. 107-114en_US
dc.identifier.urihttp://hdl.handle.net/10722/158535-
dc.description.abstractTransmission expansion planning (TEP) has faced a significant change since the deregulation of power systems. It becomes even more complicated due to the conflicting objectives and uncertainties which have been exposed by the power industry restructuring. In this paper, a value-based transmission expansion planning algorithm is proposed. The algorithm makes use of the probability density functions (PDFs) of locational marginal prices (LMPs) to deal with the changes in power flow patterns due to the changes in offering prices set by generation companies. © 2006 IEEE.en_US
dc.languageengen_US
dc.relation.ispartof2006 38th Annual North American Power Symposium, NAPS-2006 Proceedingsen_US
dc.subjectDeregulationen_US
dc.subjectMonte Carlo Simulationen_US
dc.subjectTransmission Expansion Planningen_US
dc.subjectValue-Baseden_US
dc.titleValue-based transmission expansion planning in deregulated marketen_US
dc.typeConference_Paperen_US
dc.identifier.emailZhong, J:jinzhong@hkucc.hku.hken_US
dc.identifier.authorityZhong, J=rp00212en_US
dc.description.naturelink_to_subscribed_fulltexten_US
dc.identifier.doi10.1109/NAPS.2006.360131en_US
dc.identifier.scopuseid_2-s2.0-48449098147en_US
dc.relation.referenceshttp://www.scopus.com/mlt/select.url?eid=2-s2.0-48449098147&selection=ref&src=s&origin=recordpageen_US
dc.identifier.spage107en_US
dc.identifier.epage114en_US
dc.identifier.scopusauthoridLee, CW=16157380600en_US
dc.identifier.scopusauthoridNg, SKK=24080915900en_US
dc.identifier.scopusauthoridZhong, J=13905948700en_US

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats