File Download
There are no files associated with this item.
Supplementary
-
Citations:
- Scopus: 0
- Appears in Collections:
Article: Method for generation bidding and transaction considering transmission losses and transmission constraints
Title | Method for generation bidding and transaction considering transmission losses and transmission constraints |
---|---|
Authors | |
Issue Date | 2000 |
Citation | Dianli Xitong Zidonghua/Automation Of Electric Power Systems, 2000, v. 24 n. 7, p. 16-19 How to Cite? |
Abstract | A new model for multi-period generation bidding and transaction in the electricity market is described based on the nonlinear formulation. Pump station is considered in the multi-period model. The effect of security constraints and transmission losses on generation schedule is considered. Nonlinear programming is used to get the most profitable value according to the power flow and the bids offered by plants. The transaction schedule for a 6-bus system with a pump station is calculated to demonstrate the effectiveness of the proposed model. The results show that the security constraints and transmission losses have important impact on transaction schedule, and by multi-period model the transaction schedule may obtain more profitable value. |
Persistent Identifier | http://hdl.handle.net/10722/155125 |
ISSN | 2023 SCImago Journal Rankings: 1.171 |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Zhang, Yi | en_US |
dc.contributor.author | Zhong, Jin | en_US |
dc.contributor.author | Bai, Xiaomin | en_US |
dc.date.accessioned | 2012-08-08T08:31:57Z | - |
dc.date.available | 2012-08-08T08:31:57Z | - |
dc.date.issued | 2000 | en_US |
dc.identifier.citation | Dianli Xitong Zidonghua/Automation Of Electric Power Systems, 2000, v. 24 n. 7, p. 16-19 | en_US |
dc.identifier.issn | 1000-1026 | en_US |
dc.identifier.uri | http://hdl.handle.net/10722/155125 | - |
dc.description.abstract | A new model for multi-period generation bidding and transaction in the electricity market is described based on the nonlinear formulation. Pump station is considered in the multi-period model. The effect of security constraints and transmission losses on generation schedule is considered. Nonlinear programming is used to get the most profitable value according to the power flow and the bids offered by plants. The transaction schedule for a 6-bus system with a pump station is calculated to demonstrate the effectiveness of the proposed model. The results show that the security constraints and transmission losses have important impact on transaction schedule, and by multi-period model the transaction schedule may obtain more profitable value. | en_US |
dc.language | eng | en_US |
dc.relation.ispartof | Dianli Xitong Zidonghua/Automation of Electric Power Systems | en_US |
dc.title | Method for generation bidding and transaction considering transmission losses and transmission constraints | en_US |
dc.type | Article | en_US |
dc.identifier.email | Zhong, Jin:jinzhong@hkucc.hku.hk | en_US |
dc.identifier.authority | Zhong, Jin=rp00212 | en_US |
dc.description.nature | link_to_subscribed_fulltext | en_US |
dc.identifier.scopus | eid_2-s2.0-0033906445 | en_US |
dc.identifier.volume | 24 | en_US |
dc.identifier.issue | 7 | en_US |
dc.identifier.spage | 16 | en_US |
dc.identifier.epage | 19 | en_US |
dc.publisher.place | China | en_US |
dc.identifier.scopusauthorid | Zhang, Yi=11540122900 | en_US |
dc.identifier.scopusauthorid | Zhong, Jin=13905948700 | en_US |
dc.identifier.scopusauthorid | Bai, Xiaomin=7201893222 | en_US |
dc.identifier.issnl | 1000-1026 | - |