File Download
There are no files associated with this item.
Supplementary
-
Citations:
- Scopus: 0
- Appears in Collections:
Conference Paper: Applying neural networks in reliability analysis of a panel pillar
Title | Applying neural networks in reliability analysis of a panel pillar |
---|---|
Authors | |
Keywords | Neural Networks (Nn) Panel Pillar Reliability Analysis |
Issue Date | 2002 |
Citation | Proceedings In Mining Science And Safety Technology, 2002, p. 187-191 How to Cite? |
Abstract | The panel pillar in the drilling room plays an important role in keeping the stability of the stope roof in backfill mining method of Feng huangshan copper mine. Reliability analysis method is introduced to optimize the panel pillar in this paper. Reliability analysis and design of the pillar structure is performed using neural networks. The results show that the rational design value of the panel pillar diameter should be confined to the limit between 3.4m and 3.6m. |
Persistent Identifier | http://hdl.handle.net/10722/152124 |
References |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Deng, J | en_US |
dc.contributor.author | Yue, Z | en_US |
dc.contributor.author | Zhu, H | en_US |
dc.date.accessioned | 2012-06-26T06:35:20Z | - |
dc.date.available | 2012-06-26T06:35:20Z | - |
dc.date.issued | 2002 | en_US |
dc.identifier.citation | Proceedings In Mining Science And Safety Technology, 2002, p. 187-191 | en_US |
dc.identifier.uri | http://hdl.handle.net/10722/152124 | - |
dc.description.abstract | The panel pillar in the drilling room plays an important role in keeping the stability of the stope roof in backfill mining method of Feng huangshan copper mine. Reliability analysis method is introduced to optimize the panel pillar in this paper. Reliability analysis and design of the pillar structure is performed using neural networks. The results show that the rational design value of the panel pillar diameter should be confined to the limit between 3.4m and 3.6m. | en_US |
dc.language | eng | en_US |
dc.relation.ispartof | Proceedings in Mining Science and Safety Technology | en_US |
dc.subject | Neural Networks (Nn) | en_US |
dc.subject | Panel Pillar | en_US |
dc.subject | Reliability Analysis | en_US |
dc.title | Applying neural networks in reliability analysis of a panel pillar | en_US |
dc.type | Conference_Paper | en_US |
dc.identifier.email | Yue, Z:yueqzq@hkucc.hku.hk | en_US |
dc.identifier.authority | Yue, Z=rp00209 | en_US |
dc.description.nature | link_to_subscribed_fulltext | en_US |
dc.identifier.scopus | eid_2-s2.0-1542347055 | en_US |
dc.relation.references | http://www.scopus.com/mlt/select.url?eid=2-s2.0-1542347055&selection=ref&src=s&origin=recordpage | en_US |
dc.identifier.spage | 187 | en_US |
dc.identifier.epage | 191 | en_US |
dc.identifier.scopusauthorid | Deng, J=7402612836 | en_US |
dc.identifier.scopusauthorid | Yue, Z=7102782735 | en_US |
dc.identifier.scopusauthorid | Zhu, H=7404663867 | en_US |