File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Conference Paper: A new method for independent task scheduling in nonlinearly DAG clustering

TitleA new method for independent task scheduling in nonlinearly DAG clustering
Authors
Issue Date2004
Citation
Proceedings Of The International Symposium On Parallel Architectures, Algorithms And Networks, I-Span, 2004, p. 187-192 How to Cite?
AbstractFor the parallel tasks represented by the Directed Acyclic Graph (DAG), if it is linearly clustered, the ordering of the execution time of the tasks in each cluster is based on their arrows in the DAG. But for nonlinearly clustering, the ordering of the independent tasks in each cluster is not easily decided. Improper ordering of these independent tasks will greatly increase the scheduling length of the DAG. We discuss the shortcomings of current scheduling algorithms and the reason behind poor performance, and then propose some new node information to be extracted which is used by a new independent tasks scheduling algorithm based on the Maximized Parallelism Degree (MPD). Experimental results show that the MPD algorithm can yield better performance than the previous algorithms.
Persistent Identifierhttp://hdl.handle.net/10722/151901
References

 

DC FieldValueLanguage
dc.contributor.authorHua, QSen_US
dc.contributor.authorChen, ZGen_US
dc.contributor.authorLau, FCMen_US
dc.date.accessioned2012-06-26T06:30:35Z-
dc.date.available2012-06-26T06:30:35Z-
dc.date.issued2004en_US
dc.identifier.citationProceedings Of The International Symposium On Parallel Architectures, Algorithms And Networks, I-Span, 2004, p. 187-192en_US
dc.identifier.urihttp://hdl.handle.net/10722/151901-
dc.description.abstractFor the parallel tasks represented by the Directed Acyclic Graph (DAG), if it is linearly clustered, the ordering of the execution time of the tasks in each cluster is based on their arrows in the DAG. But for nonlinearly clustering, the ordering of the independent tasks in each cluster is not easily decided. Improper ordering of these independent tasks will greatly increase the scheduling length of the DAG. We discuss the shortcomings of current scheduling algorithms and the reason behind poor performance, and then propose some new node information to be extracted which is used by a new independent tasks scheduling algorithm based on the Maximized Parallelism Degree (MPD). Experimental results show that the MPD algorithm can yield better performance than the previous algorithms.en_US
dc.languageengen_US
dc.relation.ispartofProceedings of the International Symposium on Parallel Architectures, Algorithms and Networks, I-SPANen_US
dc.titleA new method for independent task scheduling in nonlinearly DAG clusteringen_US
dc.typeConference_Paperen_US
dc.identifier.emailLau, FCM:fcmlau@cs.hku.hken_US
dc.identifier.authorityLau, FCM=rp00221en_US
dc.description.naturelink_to_subscribed_fulltexten_US
dc.identifier.scopuseid_2-s2.0-3543109170en_US
dc.relation.referenceshttp://www.scopus.com/mlt/select.url?eid=2-s2.0-3543109170&selection=ref&src=s&origin=recordpageen_US
dc.identifier.spage187en_US
dc.identifier.epage192en_US
dc.identifier.scopusauthoridHua, QS=15060090400en_US
dc.identifier.scopusauthoridChen, ZG=7409491338en_US
dc.identifier.scopusauthoridLau, FCM=7102749723en_US

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats