File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Article: Significant factors causing time and cost overruns in construction projects in the gaza strip: Contractors' perspective

TitleSignificant factors causing time and cost overruns in construction projects in the gaza strip: Contractors' perspective
Authors
KeywordsConstruction
Contractors Survey
Cost
Gaza Strip
Overruns
Time
Issue Date2010
PublisherThe Chinese Research Institute of Construction Management. The Journal's web site is located at http://www.bre.polyu.edu.hk/ijcm_Abstract/index.htm
Citation
International Journal Of Construction Management, 2010, v. 10 n. 1, p. 35-60 How to Cite?
AbstractThe construction industry is considered one of the most important industries in Palestine. However, most construction projects in the Gaza Strip have been exposed to time and cost overruns. The aim of this paper is to identify factors influencing time and cost overruns in construction projects in the Gaza Strip. A detailed questionnaire containing 110 factors that caused time delay and 42 factors that caused cost overruns was developed as a basis to invite inputs from contractors. 80 questionnaires were distributed to contractors and 66 were completed and returned representing an 83% response rate. The view of contractors has been analyzed to rank the causes of delay and cost overruns on an importance index. The most significant causes of time delay identified in this research are; strikes, border closures, lack of materials in markets, shortage of construction materials at site, delay of material delivery to site, cash-flow problems during construction, and poor site management. The most significant causes of cost overruns are; increase in material prices due to continuous border closures, delay in construction, supply of raw materials and equipment by contractors, fluctuations in the cost of building materials, project materials monopoly by suppliers, instability of the local currency in relation to dollar value, low commitment of donors to compensate any negative outcomes attributable to the poor economic and political situation, and donor policy in awarding tenders to the lowest bidder. Better project management procedures and the inclusion of an appropriate contingency allowance in the pre-contract estimate are recommended as a means of minimizing the adverse effect of construction delays.
Persistent Identifierhttp://hdl.handle.net/10722/150521
ISSN
2020 SCImago Journal Rankings: 0.505
ISI Accession Number ID
References

 

DC FieldValueLanguage
dc.contributor.authorEnshassi, Aen_US
dc.contributor.authorKumaraswamy, Men_US
dc.contributor.authorJomah, ANen_US
dc.date.accessioned2012-06-26T06:05:24Z-
dc.date.available2012-06-26T06:05:24Z-
dc.date.issued2010en_US
dc.identifier.citationInternational Journal Of Construction Management, 2010, v. 10 n. 1, p. 35-60en_US
dc.identifier.issn1562-3599en_US
dc.identifier.urihttp://hdl.handle.net/10722/150521-
dc.description.abstractThe construction industry is considered one of the most important industries in Palestine. However, most construction projects in the Gaza Strip have been exposed to time and cost overruns. The aim of this paper is to identify factors influencing time and cost overruns in construction projects in the Gaza Strip. A detailed questionnaire containing 110 factors that caused time delay and 42 factors that caused cost overruns was developed as a basis to invite inputs from contractors. 80 questionnaires were distributed to contractors and 66 were completed and returned representing an 83% response rate. The view of contractors has been analyzed to rank the causes of delay and cost overruns on an importance index. The most significant causes of time delay identified in this research are; strikes, border closures, lack of materials in markets, shortage of construction materials at site, delay of material delivery to site, cash-flow problems during construction, and poor site management. The most significant causes of cost overruns are; increase in material prices due to continuous border closures, delay in construction, supply of raw materials and equipment by contractors, fluctuations in the cost of building materials, project materials monopoly by suppliers, instability of the local currency in relation to dollar value, low commitment of donors to compensate any negative outcomes attributable to the poor economic and political situation, and donor policy in awarding tenders to the lowest bidder. Better project management procedures and the inclusion of an appropriate contingency allowance in the pre-contract estimate are recommended as a means of minimizing the adverse effect of construction delays.en_US
dc.languageengen_US
dc.publisherThe Chinese Research Institute of Construction Management. The Journal's web site is located at http://www.bre.polyu.edu.hk/ijcm_Abstract/index.htmen_US
dc.relation.ispartofInternational Journal of Construction Managementen_US
dc.subjectConstructionen_US
dc.subjectContractors Surveyen_US
dc.subjectCosten_US
dc.subjectGaza Stripen_US
dc.subjectOverrunsen_US
dc.subjectTimeen_US
dc.titleSignificant factors causing time and cost overruns in construction projects in the gaza strip: Contractors' perspectiveen_US
dc.typeArticleen_US
dc.identifier.emailKumaraswamy, M:mohan@hkucc.hku.hken_US
dc.identifier.authorityKumaraswamy, M=rp00126en_US
dc.description.naturelink_to_subscribed_fulltexten_US
dc.identifier.doi10.1080/15623599.2010.10773137-
dc.identifier.scopuseid_2-s2.0-77949864709en_US
dc.identifier.hkuros171926-
dc.relation.referenceshttp://www.scopus.com/mlt/select.url?eid=2-s2.0-77949864709&selection=ref&src=s&origin=recordpageen_US
dc.identifier.volume10en_US
dc.identifier.issue1en_US
dc.identifier.spage35en_US
dc.identifier.epage60en_US
dc.identifier.isiWOS:000212447900003-
dc.publisher.placeHong Kongen_US
dc.identifier.scopusauthoridEnshassi, A=6602691926en_US
dc.identifier.scopusauthoridKumaraswamy, M=35566270600en_US
dc.identifier.scopusauthoridJomah, AN=35758721100en_US
dc.identifier.issnl1562-3599-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats