File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Article: Design on the general layout of Three Gorges project

TitleDesign on the general layout of Three Gorges project
Authors
KeywordsDesign
General layout
Three Gorges project
Water and electricity engineering
Issue Date2009
Citation
Shuili Fadian Xuebao/Journal Of Hydroelectric Engineering, 2009, v. 28 n. 6, p. 13-18 How to Cite?
AbstractThe Three Gorges water conservancy project is a key backbone engineering for the development and harnessing of the Changjiang River. The main purposes of this project are flood control of the middle and lower reaches, particularly the Jingjiang reach, electricity generation for central China, east China and Sichuan Province, improvement of navigation in the reach from Yichang to Chongqing and the middle reach. Through long years of study on the general layout, many important technical issues in design of the dam have been solved. This paper presents an introduction to the studies of some major technical problems, such as the selection of dam site, layout of the dam, powerhouses, navigation structures, sand and floater releasing structures, river diversion and cutoff, navigation during construction, and sedimentation. ©.
Persistent Identifierhttp://hdl.handle.net/10722/132399
ISSN
2023 SCImago Journal Rankings: 0.333
References

 

DC FieldValueLanguage
dc.contributor.authorNiu, Xen_HK
dc.contributor.authorWang, Xen_HK
dc.contributor.authorChen, Hen_HK
dc.date.accessioned2011-03-28T09:24:08Z-
dc.date.available2011-03-28T09:24:08Z-
dc.date.issued2009en_HK
dc.identifier.citationShuili Fadian Xuebao/Journal Of Hydroelectric Engineering, 2009, v. 28 n. 6, p. 13-18en_HK
dc.identifier.issn1003-1243en_HK
dc.identifier.urihttp://hdl.handle.net/10722/132399-
dc.description.abstractThe Three Gorges water conservancy project is a key backbone engineering for the development and harnessing of the Changjiang River. The main purposes of this project are flood control of the middle and lower reaches, particularly the Jingjiang reach, electricity generation for central China, east China and Sichuan Province, improvement of navigation in the reach from Yichang to Chongqing and the middle reach. Through long years of study on the general layout, many important technical issues in design of the dam have been solved. This paper presents an introduction to the studies of some major technical problems, such as the selection of dam site, layout of the dam, powerhouses, navigation structures, sand and floater releasing structures, river diversion and cutoff, navigation during construction, and sedimentation. ©.en_HK
dc.languageengen_US
dc.relation.ispartofShuili Fadian Xuebao/Journal of Hydroelectric Engineeringen_HK
dc.subjectDesignen_HK
dc.subjectGeneral layouten_HK
dc.subjectThree Gorges projecten_HK
dc.subjectWater and electricity engineeringen_HK
dc.titleDesign on the general layout of Three Gorges projecten_HK
dc.typeArticleen_HK
dc.identifier.emailWang, X: wangxm@hku.hken_HK
dc.identifier.authorityWang, X=rp01452en_HK
dc.description.naturelink_to_subscribed_fulltexten_US
dc.identifier.scopuseid_2-s2.0-74249109941en_HK
dc.relation.referenceshttp://www.scopus.com/mlt/select.url?eid=2-s2.0-74249109941&selection=ref&src=s&origin=recordpageen_HK
dc.identifier.volume28en_HK
dc.identifier.issue6en_HK
dc.identifier.spage13en_HK
dc.identifier.epage18en_HK
dc.identifier.scopusauthoridNiu, X=23393351400en_HK
dc.identifier.scopusauthoridWang, X=23092524200en_HK
dc.identifier.scopusauthoridChen, H=35219640200en_HK
dc.identifier.issnl1003-1243-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats