Results 1 to 12 of 12
Page 1 of 1
TypeTitleAuthor(s)YearViews
A Comparative Study of the Benefits of Applying Target Cost Contracts between South Australia and Hong KongChan, DWM; Lam, PTI; Chan, HL; Ma, T; Thomas, P201225
 
Application of Target Cost Contracts and Guaranteed Maximum Price Contracts in the Construction Industry of Hong KongChan, JHL; Chan, DWM; Lam, PTI201262
 
An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in constructionChan, DWM; Chan, APC; Lam, PTI; Wong, JMW2011375
 
Guaranteed maximum price (GMP) contracts in practice: a case study of a private office development project in Hong KongChan, DWM; Lam, PTI; Chan, APC; Wong, JMW2011161
 
Identifying the critical success factors for target cost contracts in the construction industryChan, DMW; Chan, APC; Lam, PTI; Wong, JMW2010224
 
Coping with structural change in construction: experiences gained from advanced economiesNg, TST; Fan, RYC; Wong, JMW; Chan, APC; Chiang, YH; Lam, PTI; Kumaraswamy, MM2009139
 
A Generic Framework of Performance Specifications for Specialist WorksLam, PTI; Kumaraswamy, MM; Ng, TST200788
 
International treatise on construction specification problems from a legal perspectiveLam, PTI; Kumaraswamy, MM; Ng, TST2007135
 
The roles and characteristics of specifications for different project delivery approachesLam, PTI; Kumaraswamy, MM; Ng, TST2005123
 
The use of construction specifications in SingaporeLam, PTI; Kumaraswamy, MM; Ng, ST2004206
 
A comparative study of user perceptions on prescriptive specifications versus performance-based specificationsLam, PTI; Kumaraswamy, MM; Ng, TST200396
 
The multiple roles of specifications in lean constructionLam, PTI; Kumaraswamy, MM; Ng, TST200192
 
Page 1 of 1
Export Records
Step 1: Select content and export format
  • Citation only
Step 2: Select export method
  • Download