File Download
Supplementary
-
Citations:
- Appears in Collections:
postgraduate thesis: A cost-based model for optimising the construction logisticsschedules
| Title | A cost-based model for optimising the construction logisticsschedules |
|---|---|
| Authors | |
| Advisors | Advisor(s):Ng, TST |
| Issue Date | 2011 |
| Publisher | The University of Hong Kong (Pokfulam, Hong Kong) |
| Citation | Fang, Y. [方媛]. (2011). A cost-based model for optimising the construction logistics schedules. (Thesis). University of Hong Kong, Pokfulam, Hong Kong SAR. Retrieved from http://dx.doi.org/10.5353/th_b4608035 |
| Degree | Doctor of Philosophy |
| Subject | Construction industry - Management - Data processing. Business logistics - Data processing. Production scheduling - Data processing. |
| Dept/Program | Civil Engineering |
| Persistent Identifier | http://hdl.handle.net/10722/163595 |
| HKU Library Item ID | b4608035 |
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | Ng, TST | - |
| dc.contributor.author | Fang, Yuan | - |
| dc.contributor.author | 方媛 | - |
| dc.date.issued | 2011 | - |
| dc.identifier.citation | Fang, Y. [方媛]. (2011). A cost-based model for optimising the construction logistics schedules. (Thesis). University of Hong Kong, Pokfulam, Hong Kong SAR. Retrieved from http://dx.doi.org/10.5353/th_b4608035 | - |
| dc.identifier.uri | http://hdl.handle.net/10722/163595 | - |
| dc.language | eng | - |
| dc.publisher | The University of Hong Kong (Pokfulam, Hong Kong) | - |
| dc.relation.ispartof | HKU Theses Online (HKUTO) | - |
| dc.rights | The author retains all proprietary rights, (such as patent rights) and the right to use in future works. | - |
| dc.rights | This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. | - |
| dc.source.uri | http://hub.hku.hk/bib/B46080351 | - |
| dc.subject.lcsh | Construction industry - Management - Data processing. | - |
| dc.subject.lcsh | Business logistics - Data processing. | - |
| dc.subject.lcsh | Production scheduling - Data processing. | - |
| dc.title | A cost-based model for optimising the construction logisticsschedules | - |
| dc.type | PG_Thesis | - |
| dc.identifier.hkul | b4608035 | - |
| dc.description.thesisname | Doctor of Philosophy | - |
| dc.description.thesislevel | Doctoral | - |
| dc.description.thesisdiscipline | Civil Engineering | - |
| dc.description.nature | published_or_final_version | - |
| dc.identifier.doi | 10.5353/th_b4608035 | - |
| dc.date.hkucongregation | 2011 | - |
| dc.identifier.mmsid | 991031912799703414 | - |
