| | Title | Author(s) | Year | View Count | | 1 |  | Yard planning for vessel services with a cyclical calling pattern | Ng, WC; Mak, KL; Li, MK | 2010 | 140 |
| 2 |  | Factorial effects on the performance of closed-loop asynchronous automatic assembly systems | Leung, WK; Ng, WC | 2010 | 57 |
| 3 |  | Scheduling trucks in container terminals using a genetic algorithm | Ng, WC; Mak, KL; Zhang, YX | 2007 | 541 |
| 4 |  | Evaluating the impact of vessel-traffic interference on container terminal capacity | Ng, WG; Wong, CS | 2006 | 137 |
| 5 |  | Quay crane scheduling in container terminals | Ng, WC; Mak, KL | 2006 | 596 |
| 6 |  | Yard Crane Scheduling in a Port Container Terminal Using Genetic Algorithm | Ng, WC; Mak, KL; Tsang, WS | 2006 | 629 |
| 7 |  | Scheduling yard crane in a port container terminal using genetic algorithm | Ng, WC; Mak, KL; Tsang, WS | 2006 | 60 |
| 8 |  | Yard crane scheduling in port container terminals | Ng, WC; Mak, KL | 2005 | 196 |
| 9 |  | Dispatching vehicles in a mega container terminal | Bish, EK; Chen, FY; Leong, YT; Nelson, BL; Ng, WC; Simchi-Levi, D | 2005 | 122 |
| 10 |  | Crane scheduling in container yards with inter-crane interference | Ng, WC | 2005 | 153 |
| 11 |  | Analysis of optimal opportunistic replenishment policies for inventory systems by using a (s,S) model with a maximum issue quantity restriction | Mak, KL; Lai, KK; Ng, WC; Yiu, KFC | 2005 | 73 |
| 12 |  | An effective heuristic for scheduling a yard crane to handle jobs with different ready times | Ng, WC; Mak, KL | 2005 | 74 |
| 13 |  | Sequencing of container pickup trucks in container yard blocks | Ng, WC; Mak, KL | 2004 | 178 |
| 14 |  | Cyclic Deadlock Prediction for Zone-Control AGV System | Moorthy, K; Wee, HG; Ng, WC; Teo, CP | 2003 | 108 |
| 15 |  | Analysing a new vehicle scheduling and location problem | Ng, WC; Bish, EK; Leong, TY; Li, CL; Simchi-Levi, D | 2001 | 132 |
| 16 |  | An efficient heuristic for the kanban assignment problem in the design of serial just-in-time production systems | Mak, KL; Ng, WC | 1999 | 107 |
| 17 |  | Synthesis of Kanban control policies for multi-stage just-in-time assembly systems | Mak, KL; Ng, WC | 1999 | 47 |
| 18 |  | Economic design of a complete inspection plan with interactive quality improvement | Ng, WC; Van Hui, Y | 1997 | 55 |
| 19 |  | A branch and bound algorithm for hoist scheduling of a circuit board production line | Ng, WC | 1996 | 69 |
| 20 |  | Interactive quality improvement of a process subject to complete inspection | Ng, WC; Hui, YV | 1996 | 54 |
|