HKU ResearcherPage: Ng, WC

Export Records
Step 1: Select material type
  • Articles (21)
  • Conf. Papers & Presentations (4)
Step 2: Select content and export format
  • Citation only
  • Citation + Fulltext [Email Only]
Step 3: Select export method
  • Download
  • Email
  • Select a material type, please.
  • You must login to use email export.
 
Ng, Wing Cheong picture
Dr Ng, Wing Cheong
吳永昌
  • Teaching Fellow
Articles (Ng, WC)

Results 1-20 of 21.

TitleAuthor(s)YearView Count
1Yard planning for vessel services with a cyclical calling patternNg, WC; Mak, KL; Li, MK2010140
2Factorial effects on the performance of closed-loop asynchronous automatic assembly systemsLeung, WK; Ng, WC201056
3Scheduling trucks in container terminals using a genetic algorithmNg, WC; Mak, KL; Zhang, YX2007540
4Evaluating the impact of vessel-traffic interference on container terminal capacityNg, WG; Wong, CS2006137
5Quay crane scheduling in container terminalsNg, WC; Mak, KL2006596
6Yard Crane Scheduling in a Port Container Terminal Using Genetic AlgorithmNg, WC; Mak, KL; Tsang, WS2006629
7Scheduling yard crane in a port container terminal using genetic algorithmNg, WC; Mak, KL; Tsang, WS200660
8Yard crane scheduling in port container terminalsNg, WC; Mak, KL2005196
9Dispatching vehicles in a mega container terminalBish, EK; Chen, FY; Leong, YT; Nelson, BL; Ng, WC; Simchi-Levi, D2005122
10Crane scheduling in container yards with inter-crane interferenceNg, WC2005153
11Analysis of optimal opportunistic replenishment policies for inventory systems by using a (s,S) model with a maximum issue quantity restrictionMak, KL; Lai, KK; Ng, WC; Yiu, KFC200572
12An effective heuristic for scheduling a yard crane to handle jobs with different ready timesNg, WC; Mak, KL200574
13Sequencing of container pickup trucks in container yard blocksNg, WC; Mak, KL2004178
14Cyclic Deadlock Prediction for Zone-Control AGV SystemMoorthy, K; Wee, HG; Ng, WC; Teo, CP2003108
15Analysing a new vehicle scheduling and location problemNg, WC; Bish, EK; Leong, TY; Li, CL; Simchi-Levi, D2001132
16An efficient heuristic for the kanban assignment problem in the design of serial just-in-time production systemsMak, KL; Ng, WC1999107
17Synthesis of Kanban control policies for multi-stage just-in-time assembly systemsMak, KL; Ng, WC199947
18Economic design of a complete inspection plan with interactive quality improvementNg, WC; Van Hui, Y199755
19A branch and bound algorithm for hoist scheduling of a circuit board production lineNg, WC199669
20Interactive quality improvement of a process subject to complete inspectionNg, WC; Hui, YV199654

 ! 

Close

Please give us some feedback!