| | Title | Author(s) | Year | View Count |
| 1 |  | Public participation in infrastructure and construction projects in China: from an EIA-based to a whole-cycle process | Li, THY; Ng, ST; Skitmore, M | 2012 | 106 |
| 2 |  | Conflict or consensus: an investigation of stakeholder concerns during the participation process of major infrastructure and construction projects in Hong Kong | Li, THY; Ng, ST; Skitmore, M | 2012 | 125 |
| 3 |  | An ant colony system based decision support system for construction time-cost optimization | Zhang, Y; Ng, ST | 2012 | 81 |
| 4 |  | Factors influencing the success of PPP at feasibility stage: a tripartite comparison study in Hong Kong | Ng, ST; Wong, YMW; Wong, JMW | 2012 | 83 |
| 5 |  | Utilizing societal engagement as a vehicle for enhancing the image and sustainability of the construction industry | Wong, KWK; Kumaraswamy, MM; Mahesh, G; Ng, TST | 2012 | 98 |
| 6 |  | Rethinking public participation in infrastructure projects | Ng, TST; Li, THY; Wong, JMW | 2012 | 97 |
| 7 |  | Satisfaction of residents on public housings built before and after implementation of ISO9000 | Ng, ST; Palaneeswaran, E; Kumaraswamy, MM | 2011 | 323 |
| 8 |  | An econometric model for forecasting private construction investment in Hong Kong | Ng, ST; Fan, RYC; Wong, JMW | 2011 | 172 |
| 9 |  | Predicting construction market growth for urban metropolis: An econometric analysis | Fan, RYC; Ng, ST; Wong, JMW | 2011 | 162 |
| 10 |  | Applying Z-score model to distinguish insolvent construction companies in China | Thomas Ng, S; Wong, JMW; Zhang, J | 2011 | 209 |
| 11 |  | Applying activity-based costing approach for construction logistics cost analysis | Fang, Y; Ng, ST | 2011 | 260 |
| 12 |  | Strategic planning for the sustainable development of the construction industry in Hong Kong | Wong, JMW; Thomas Ng, S; Chan, APC | 2010 | 319 |
| 13 |  | Forecasting construction tender price index inm Hong Kong using vector error correction model | Wong, JMW; Ng, ST | 2010 | 275 |
| 14 |  | Simulating the effect of risks on equity return for concession-based public-private partnership projects | Ng, ST; Xie, J; Kumaraswamy, MM | 2010 | 109 |
| 15 |  | Labour-intensive construction sub-contractors: Their critical success factors | Ng, ST; Tang, Z | 2010 | 184 |
| 16 |  | Reliability of the box-jenkins model for forecasting construction demand covering times of economic austerity | Fan, RYC; Ng, ST; Wong, JMW | 2010 | 257 |
| 17 |  | A structural equation model of feasibility evaluation and project success for publicprivate partnerships in Hong Kong | Ng, ST; Wong, YMW; Wong, JMW | 2010 | 337 |
| 18 |  | HKU's double professional civil engineering and law programme | Yeung, AT; Ng, ST; Tham, LG; Lee, PKK | 2010 | 290 |
| 19 |  | Delineating the performance standards of engineering consultants at design stage | Chow, LK; Ng, TST | 2010 | 91 |
| 20 |  | Enhancing the logistics of construction materials through activity-based simulation approach | Ng, ST; Shi, J; Fang, Y | 2009 | 266 |