File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Article: Reservoir-Type Hydropower Equivalent Model Based on a Future Cost Piecewise Approximation

TitleReservoir-Type Hydropower Equivalent Model Based on a Future Cost Piecewise Approximation
Authors
KeywordsHydro-thermal scheduling
Hydropower model
Hydropower plants
Issue Date2018
PublisherElsevier SA. The Journal's web site is located at http://www.elsevier.com/locate/epsr
Citation
Electric Power Systems Research, 2018, v. 155, p. 184-195 How to Cite?
AbstractThe long-term (LT) scheduling of reservoir-type hydropower plants is a multistage stochastic dynamic problem that has been traditionally solved using the stochastic dual dynamic programming (SDDP) approach. This LT schedule of releases should be met through short-term (ST) scheduling decisions obtained from a hydro-thermal scheduling that considers uncertainties. Both time scales can be linked if the ST problem considers as input the future cost function (FCF) obtained from LT studies. Known the piecewise-linear FCF, the hydro-scheduling can be solved as a one-stage problem. Under certain considerations a single segment of the FCF can be used to solve the schedule. From this formulation an equivalent model for the hydropower plant can be derived and used in ST studies. This model behaves accordingly to LT conditions to be met, and provides a marginal cost for dispatching the plant. A generation company (GENCO) owning a mix of hydro, wind, and thermal power will be the subject of study where the model will be implemented. The GENCO faces the problem of scheduling the hydraulic resource under uncertainties from e.g. wind and load while determining the market bids that maximize its profit under uncertainties from market prices. A two-stage stochastic unit commitment (SUC) for the ST scheduling implementing the equivalent hydro model will be solved.
Persistent Identifierhttp://hdl.handle.net/10722/259240
ISSN
2021 Impact Factor: 3.818
2020 SCImago Journal Rankings: 0.845
ISI Accession Number ID

 

DC FieldValueLanguage
dc.contributor.authorAlvarez, M-
dc.contributor.authorRonnberg, SK-
dc.contributor.authorBermúdez, J-
dc.contributor.authorZhong, J-
dc.contributor.authorBollen, MHJ-
dc.date.accessioned2018-09-03T04:03:44Z-
dc.date.available2018-09-03T04:03:44Z-
dc.date.issued2018-
dc.identifier.citationElectric Power Systems Research, 2018, v. 155, p. 184-195-
dc.identifier.issn0378-7796-
dc.identifier.urihttp://hdl.handle.net/10722/259240-
dc.description.abstractThe long-term (LT) scheduling of reservoir-type hydropower plants is a multistage stochastic dynamic problem that has been traditionally solved using the stochastic dual dynamic programming (SDDP) approach. This LT schedule of releases should be met through short-term (ST) scheduling decisions obtained from a hydro-thermal scheduling that considers uncertainties. Both time scales can be linked if the ST problem considers as input the future cost function (FCF) obtained from LT studies. Known the piecewise-linear FCF, the hydro-scheduling can be solved as a one-stage problem. Under certain considerations a single segment of the FCF can be used to solve the schedule. From this formulation an equivalent model for the hydropower plant can be derived and used in ST studies. This model behaves accordingly to LT conditions to be met, and provides a marginal cost for dispatching the plant. A generation company (GENCO) owning a mix of hydro, wind, and thermal power will be the subject of study where the model will be implemented. The GENCO faces the problem of scheduling the hydraulic resource under uncertainties from e.g. wind and load while determining the market bids that maximize its profit under uncertainties from market prices. A two-stage stochastic unit commitment (SUC) for the ST scheduling implementing the equivalent hydro model will be solved.-
dc.languageeng-
dc.publisherElsevier SA. The Journal's web site is located at http://www.elsevier.com/locate/epsr-
dc.relation.ispartofElectric Power Systems Research-
dc.subjectHydro-thermal scheduling-
dc.subjectHydropower model-
dc.subjectHydropower plants-
dc.titleReservoir-Type Hydropower Equivalent Model Based on a Future Cost Piecewise Approximation-
dc.typeArticle-
dc.identifier.emailZhong, J: jinzhong@hkucc.hku.hk-
dc.identifier.authorityZhong, J=rp00212-
dc.description.naturelink_to_subscribed_fulltext-
dc.identifier.doi10.1016/j.epsr.2017.09.028-
dc.identifier.scopuseid_2-s2.0-85032274995-
dc.identifier.hkuros288070-
dc.identifier.volume155-
dc.identifier.spage184-
dc.identifier.epage195-
dc.identifier.isiWOS:000419410300018-
dc.publisher.placeSwitzerland-
dc.identifier.issnl0378-7796-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats