Showing results 8 to 14 of 14
< previous
Title | Author(s) | Issue Date | Views | |
---|---|---|---|---|
A heuristic approach to machine loading problem in non-preemptive flexible manufacturing systems Journal:International Journal of Industrial Engineering : Theory Applications and Practice | 1998 | 77 | ||
Investigation of an additional part to optimal schedule Journal:Integrated Manufacturing Systems | 1998 | 182 | ||
Modelling failure prone flexible manufacturing systems Proceeding/Conference:IFAC Workshop on Safety, Reliability and Applications of Emerging Intelligent Control Technologies | 1995 | 102 | ||
Operational decisions for minimization of penalty cost in non-pre-emptive FMS Journal:Integrated Manufacturing Systems | 2000 | 79 | ||
A sequence algorithm for minimising makespan in multi-part and multi-machine flowshop cases Journal:Integrated Manufacturing Systems | 2000 | 75 | ||
A sequencing algorithm for makespan minimization in FMS Journal:Journal of Manufacturing Technology Management | 2004 | 175 | ||
Sequencing algorithm for minimising workspan in multi-machine cases Proceeding/Conference:9th International Working Seminar on Production Economics, Innsbruck, Austria, February 1996 | 1996 | 86 |